top of page

Whitehaven Apartments - Construction is up to the first floor

The first floor is being poured with concrete. The outlook in to the tea tree nature reserve is even better than initial thoughts.

Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page